Stargate Aluminium Gate Delivery

Aluminium-slidiing-gate-2

There are two types of aluminium gates when it comes to our delivery times.

We have stock gates that are available in set sizes in limited designs and colours. These are available from our online shop.

Please be aware that delivery can be up to 3 weeks. Email salessupport@linkcare.net to receive updates on your order.

Our bespoke, made-to-measure gates require time for construction to your unique specifications.

These gates take 6 to 8 weeks to deliver from receipt of a confirmed order. The only times non-standard gate delivery times change is during the Summer and at Christmas. Please see below for details of delivery during these periods.

Delivery Of Our Stock Aluminium Gates

We have a small range of aluminium gates in set sizes available for delivery from stock.

This means that you can have gates ordered from our online aluminium gate shop within 3 weeks of order.

Any alterations we have to make (limited to reducing the width of the gates) will add time to the delivery but we will update you of this at the time of order.

For stock gate delivery, our flat rate within England is £150 per sliding gate or pair of swing gates and £100 per pedestrian gate.

For anywhere else in the UK, please contact us for delivery costs.

aluminium-gate-installers

Delivery Of Our Made-To-Measure Aluminium Gates

Aluminium-driveway-gate-40

Our aluminium gate factory will manufacturer bespoke, made-to-measure gates to your exact specifications.

This takes time and the delivery of these gates is longer than our stock gates as a result.

Outside the periods detailed below, our delivery time for bespoke, made-to-measure gates is 6 to 8 weeks.

For stock gate delivery, our flat rate within England is £150 per sliding gate or pair of swing gates and £100 per pedestrian gate.

For anywhere else in the UK, please contact us for delivery costs.

Delivery Of Aluminium Gates During Summer

Our aluminium gate factory closes every year for the second half of August. This will only affect orders of made-to-measure gates.

This means that all aluminium gate orders confirmed after the 15th of June may have the delivery time extended by up to 3 weeks.

Our office is still open during this period if you want to contact us.

Orders confirmed before the 15th of June (order form and technical drawing signed off and deposit paid) should be delivered with normal lead times.

Aluminium-driveway-gate-21

Delivery Of Aluminium Gates At The End Of The Year

Automatic-aluminium-gates-1024x768

Our aluminium gate factory and office closes every year for Christmas. This will affect orders of made-to-measure gates and stock gates.

All made-to-measure aluminium gate orders confirmed after the 8th of October may have the delivery time extended by up to 2 weeks.

Orders for made-to-measure aluminium gates confirmed before the 8th of October (order form and technical drawing signed off and deposit paid) should be delivered with normal lead times.

Our office is open until mid-day on the 21st of December if you want to contact us. We are closed for Christmas between then and the 2nd of January, 2019.

Orders made for our stock gates from our aluminium gate online shop during the time our office is closed over Christmas will be processed as normal when we return in the New Year.

How To Choose The Perfect Aluminium Gates For Your Home

logo